North Parcel: Sheathing and Tyvek is ongoing on the exterior of the building. Windows have started to be installed on Newark Ave. MEP rough-in is ongoing on the 2nd floor. The roof has started and will be complete in approximately one month.
South Parcel: Brick is ongoing on the Newark Elevation of the residential units. Unit rough-in is complete and we will close in the units next week. CVS and Giant tenant fit out is ongoing. Townhomes foundation have begun. The townhomes have a 6 month duration.
Utilities along Wisconsin Avenue: Bozzuto Constuction Company (BCC) will begin night work this Sunday, June 15th for the waterline, which is expected to last 6-8 weeks. We apologize for any inconvenience!
Featured Image courtesy of John Ravas.
Construction Images courtesy of OxBlue Construction Cameras.
About Cathedral Commons
The residences at Cathedral Commons, opening this fall, will offer 138 apartment residences as well as eight townhomes, as well as high-end services and amenities including a boutique hotel-style lobby; fitness center; a library and conference room for private meeting space; resident lounge for hosted community social functions; rooftop deck and private outdoor courtyards; and a 24-hour concierge offering Bozzuto’s Top Notch services.
Inside each apartment will be a chef-inspired kitchen with quartz countertops, custom oak flat-panel cabinetry, white beveled subway backsplashes and upgraded GE stainless appliances. Living spaces will include hardwood flooring and contemporary chrome LED track lighting, while bathrooms will include Florentine Carrera floors and showers, chrome Moen fixtures, and custom-designed vanities with integrated square sinks.
For more information about living at Cathedral Commons, contact us HERE.